Celtic Anglia Water
Brief Project Description
This project involved the installation of dual containment pipes.Project Details
Contract Value: €1.7mBrief Description of Works: Mechanical Services Installation
The installation of dual containment pipes from existing metal salts dosing kiosk to 2 no. metal salt tank locations on the main water treatment tanks as per the following schedule of works. In addition to, the following:
- Installation of Cantilever Bracketing System on the Side of Main Water Tank
- Installation of FRP Cable Ladder System on Brackets
- Installation of Stainless Steel Clips on Bracketing System to Accept Client Supplied Dual Containment Hose
- Install Bracketing System for 2 No. Catchpot and Mount Catch Pots Locations as per Drawings
- Installation of Client Supplied Dual Containment Hose from Metal Salts Kiosk to Catchpot
- Installation of Client Supplied Dual Containment Hose from 2 No. Catchpot Locations to Remote Salt Tanks and Fix Saddle Clips
- Carry Out Final Connections for Dual Containment Hose to Metal Salt Kiosk Catchpots and Remote Metal Salt Tanks
- Label All Pipework and Carry Out Leak Test