Client
IDA Ireland
Location
Finisklin, Sligo
Sector
Industrial
Consultant
RPS Group
The new advanced office complex in Finisklin, Sligo, comprises 4,500m² of Grade A office space, spread across three floors in two interconnected wings.
These buildings have earned LEED certification for their commitment to sustainability. The facilities include dedicated spaces for electric vehicles, bike storage with charging points, and the buildings themselves are equipped with both thermal and photovoltaic (PV) solar panels.
Services
Tim Kelly Group carried out the complete mechanical and electrical installation and were the lead coordinator providing a full BIM 3D model to LOD 500.
Mechanical works consisted of the following:
- Lead co-ordinator using 3D BIM modelling
- Gas pipework installation
- Gas boilers including flue system
- Solar panel system for chlorifier
- Domestic water services
- Soils and wastes
- Supply and installation of sanitaryware
- LPHW pipework
- CHW pipework
- Supply and installation of fan coil units
- Supply and installation of LPHW heat pump and CHW heat pump
- Ventilation services including ductwork, grilles, VCD’s and FSD’s
- Supply and installation of 2 no. AHU’s office areas and 2 no. AHU’s toilet areas
- Supply and installation of full BMS system
- Testing and commissioning
Electrical installation consisted of the following works:
- Cable containment LV trunking, ELV cable tray, FA cable tray and LV cable tray.
- Sub mains cabling
- Main distribution board and 8 no. sub distribution boards
- Power factor correction unit
- General services and power
- Lighting and emergency lighting
- DALI lighting control system
- Solar PV system
- Fire alarm system
- Disabled refuge system
- Mechanical wiring
- Lighting protection system
- External lighting
- Intruder alarm system
- Earthing and bonding
- Testing and commissioning