Pharmaceutical Projects

Medtronic Customer Innovation Centre

Medtronic Customer Innovation Centre

Medtronic_Customer_Innovation_Centre

Brief Project Description

This project involved the full Electrical Service Installations for the Medtronic Customer Innovation Centre.

Project Details

Project Value: €800k

Brief Description of Works: Electrical Services Installation

Electric works including:

  • Cable Containment
  • Tie ins into existing B2 Building
  • Main & Sub Distribution Boards
  • Sub Mains Cabling
  • Power Factor Correction
  • Internal Lighting & Controls
  • Emergency Lighting
  • External Lighting
  • General Services & Power
  • Underfloor Busbar System to Desk Modules
  • Fire Alarm Installation
  • Leak Detection System
  • Structured IT Cabling System
  • Access Control System
  • Intruder Alarm System
  • CCTV System
  • Disabled Alarm System & Disabled Refuge System
  • Mechanical Wiring
  • Lightning Protection
  • Rack Mounted UPS System
  • Earthing & Bonding
  • Testing & Commissioning

Other Projects

Ashford Castle

Dunnes Stores Terryland

Sligo University Hospital

Radisson Blu Hotel Extension, Dublin

Mylan Teoranta Ltd, Galway

Ballynahinch Castle, Galway

Pharmaceutical Projects

Chanelle Group

Chanelle Group

Chanelle_Group

Brief Project Description

Mechanical and Electrical Services across a range of projects.

Project Details

Project Value: €1.5m

Brief Description of Works: Mechanical and Electrical Services Installation

Mechanical Installation including:

  • Ductwork Installation
  • Supply and Install AHU
  • CHW Installation
  • Compressed Air
  • Water Services
  • Magnahelic Gauges and Control Panel
  • BMS Installation
  • Testing And Commissioning

Electrical Works including:

  • MV Transformer & MV Switch
  • LV Switchgear
  • LV Sub-mains Cabling
  • Cable Containment
  • Lighting and Emergency Lighting
  • Power Factor Correction
  • UPS Installation
  • Wiring to Atex Manufacturing Rooms
  • General Services and Power
  • Oxygen Depletion System
  • Fire Alarm
  • Mechanical Wiring
  • CCTV and Intruder Alarm
  • Disabled Alarm and Refuge
  • Site Lighting
  • Lighting Protection
  • Testing and Commissioning

Other Projects

ECC TEO

Letterkenny IT, Phase 2B Nursing Block

Our Lady of Lourdes, Drogheda

Roscommon Decentralised Offices

Baxter Healthcare Ireland

Tubbercurry Secondary School

Pharmaceutical Projects

Avery Dennison, Longford

Avery Dennison, Longford

Avery_Dennision_Longford

Brief Project Description

This project consists of cleanroom, warehouse and office area for new Avery Dennison (formerly Finesse) Building in Longford.

Project Details

Project Value: € 1.1m

Brief Description of Works: Electrical Services Installation

Electrical Works Including:

  • Strip out of existing services
  • Containment
  • MV Switch & MV Transformer
  • Main Board & Sub Distribution Board
  • Mains & Sub-Mains Cabling
  • Lighting & Emergency Lighting
  • Data Cabling Including Fibre links
  • Fire Alarm
  • Lighting Protection
  • Intruder Alarm
  • General Services & Power
  • CCTV
  • Door Access
  • Site Lighting
  • Mechanical Wiring
  • Atex Wiring (Within Mixing Room)
  • Disabled Toilet Alarm & Disabled Refuge
  • Testing & Commissioning

Other Projects

Radisson Blu Hotel Extension, Dublin

Tubbercurry Secondary School

Castle Dargan Hotel, Sligo

Letterkenny University Hospital Radiology

Ashford Castle

Galway Mayo Institute Of Technology (GMIT)

Pharmaceutical Projects

Mylan Teoranta Ltd, Galway

Mylan Teoranta Ltd, Galway

Mylan_Teoranta

Brief Project Description

Tim Kelly Group have a permanent presence on site providing scheduled maintenance & emergency maintenance, Capital Works and out of hours callouts.

Project Details

Contract Value: €5m (Mechanical & Electrical Services)

Brief Description of Works:

Various upgrade Mechanical and Electrical projects to offices, warehouse, laboratory and cleanrooms.

Mechanical services including:

  • Ventilation
  • Air Handling Unit
  • Low-Temperature Hot Water and Chilled Water Pipework
  • Plant Stream
  • Clean Steam
  • Reverse Osmosis Water System
  • Compressed Air Plant and Processes & Nitrogen
  • Upgrade of Existing 170KW chiller
  • Oil Fired LTHW Boilers
  • Hot Water Calorifier Circulating Pumps
  • Chiller Feeding 1,000L Buffer Vessel
  • AHU for Heating and Cooling
  • VCDs and Re-heat batteries supplying grilles throughout
  • Lab Gas installation
  • BMS-System

Electrical Services including:

  • Disinvestment of existing services
  • MV Transformer and Switchgear
  • MV Cabling
  • LV Switchgear & Subs- mains cabling
  • Cleanroom Power & Lighting
  • FMS System Cabling
  • 2 no. 400 KVA UPS
  • Fire Alarm
  • PA System
  • Process Control Cabling
  • Attendances on process specialities
  • Emergency Lighting
  • Lightning Protection
  • Mechanical Wiring
  • Control and Power cabling to WFI & PW systems

Other Projects

Connacht GAA Centre of Excellence

Bon Secours Hospital Glasnevin

Hollister ULC, Ballina, Co. Mayo

Roscommon Decentralised Offices

Murdach’s Cathedral

Our Lady of Lourdes, Drogheda

Commercial Projects

Aptar Distribution Upgrade Ballinasloe

Aptar Distribution Upgrade

Brief Project Description

This project involved the Electrical Service Installations.

Project Details

Project Value: € 120k

Brief Description of Works: Electrical Services Installation

Electrical Works Including:

  • LV Switchboard
  • PF Cabling
  • Compressor Wiring
  • Earthing
  • Mechanical Ventilation System
  • Ventilation System Wiring
  • 1MVA Transformer
  • MV Cabling
  • Testing & Commissioning
  • LV Off Loader Cabling

Other Projects

Letterkenny IT, Phase 2B Nursing Block

Celestica Galway and Leixlip

HSE Roscommon Hospital Endoscopy Unit

Tipperary Town OPW Offices

St. Louis Community School, Kiltimagh

Posts navigation